羅茨鼓風機在啟動開機前應做好幾項準備工作,小編在下面的文章中就給您介紹一下應做好哪些準備工作:
Before starting Roots blower, several preparations should be made. The following article will introduce what preparations should be made:
1、完全打開進氣調節(jié)閥,出氣調節(jié)閥以及旁通管;
1. Fully open the inlet control valve, outlet control valve and bypass pipe;
2、檢查進風口空氣濾清器是否通暢,濾清器進口是否完全打開;
2. Check whether the air inlet filter is unobstructed and whether the filter inlet is fully opened;
3、檢查管道、閥門、消聲器、空氣濾清器支撐是否穩(wěn)固,不得有負荷力加在機殼上;
3. Check whether the supports of pipes, valves, mufflers and air filters are stable, and no load shall be applied to the casing;
4、檢查潤滑油是否良好,型號是否合適,潤滑油層深度應達到規(guī)定油線以上3~5厘米,冷卻水系統(tǒng)是否通暢;
4. Check whether the lubricating oil is in good condition, whether the model is appropriate, whether the depth of lubricating oil layer is 3~5cm above the specified oil line, and whether the cooling water system is smooth;
5、撥動聯軸器、檢查葉輪轉運是否靈適,有無摩擦碰撞;
5. Turn the coupling and check whether the impeller is flexible and free of friction and collision;
6、檢查各部位聯接是否良好,有無松動;
6. Check whether all parts are well connected and loose;
7、除去周圍雜物,保持風機兩米范圍內無雜物;
7. Remove the surrounding sundries and keep no sundries within two meters of the fan;
8、檢查電氣部分以及降壓啟動設備是否完好;
8. Check whether electrical parts and step-down starting equipment are in good condition;
9、檢查檢修工具是否齊備,消防滅火器材是否充足完備。
9. Check whether the maintenance tools are complete and whether the fire fighting equipment are sufficient and complete.
以上九項工作做完后,就可以開機運行了,以上小編的介紹希望可以幫到您。
After the above nine tasks are completed, you can start up and run. I hope the introduction of the above small compilation can help you.